Knitwear manufacturing since 1995Haiyang, Shandong · China

Practical tools for your buying team

Knitwear sourcing worksheets for production in China

Use these blank worksheets to prepare a product brief, compare quotations and keep sample approvals together. They support OEM and ODM projects at Huayang’s factory in Haiyang, Shandong, China, where every order receives Japanese-standard 100% garment inspection. Fill in what is confirmed and mark the questions still open.

On this page

CSV · Blank template

Product & buying brief

Record the style, quantities, sales market, target price and any documents you want to discuss with the supplier.

Download English worksheet ↓
  • Style / specification version
  • Development route: OEM / ODM
  • Contracting supplier (legal name) & proposed manufacturing site (address)
  • Destination market & sales channel

Excel / CSV · Blank template

Quotation comparison

Compare proposals using the same specification, quantity split and delivery scope. Record minimum quantities and combining conditions alongside transport, insurance and clearance responsibilities. Reconfirm the quotation, materials and schedule after changes.

  • Product specification, quantity split and minimum-quantity basis
  • Unit price, currency, payment terms and quotation inclusions
  • If used: Incoterms rule, edition and named port / place / point
  • Transport and insurance arrangements and cost scope
  • Export/import clearance and destination charges
  • Production start conditions, approvals and handover target
How to use the quotation comparison worksheet

Check comparability before comparing prices

To compare OEM and ODM knitwear quotations, first identify the same finished requirement, quantity split and approval reference. Match the development work, product inclusions, currency, delivery responsibilities and proposed milestone. Record every difference that remains open and request clarification before choosing on price. OEM and ODM describe the starting point for development; compare the scope of work and finished garment covered by each proposal.

  1. Set a common finished specification

    Give both proposals the same dated specification and quantities by style, colour and size. Identify the yarn or material option, gauge, construction, finish and measurement reference. Separate fixed requirements from alternatives you are willing to review. Link each option to its quotation and sample reference; a lower yarn rate or lighter sample alone does not establish a comparable garment price.

  2. Define the OEM or ODM development work

    Huayang provides OEM from buyer designs or specifications, with ODM development handled by its Hangzhou office. For each proposal, identify the buyer-supplied references and the design, sourcing or sample work still required. Record the development quotation, sampling stage, revisions and document handover scope. Mark each item as included, separately quoted or awaiting confirmation, with its reference. Agree available records, formats, responsibilities and permitted use for the project.

  3. Keep inclusions and evidence visible

    Check whether labels, trims, packing, sampling and the requested documentation or testing cover the same scope. Keep separate charges and unresolved work visible; an empty entry means a question remains open.

    Huayang has an independent inspection department. Confirm the inspection criteria and records required for the proposed garment and order. Record product-specific testing and material-document requirements separately, and link the evidence to the proposed yarn, garment or order.

  4. Align the commercial and delivery basis

    Keep your target purchase price separate from each supplier quotation. Record currency, quotation validity, the delivery reference and named place, together with transport, insurance and clearance responsibilities. If a delivery rule is used, record its edition. Compare the same date, place and event, with approvals and material readiness identified; dispatch, carrier handover and destination arrival can be different milestones.

Fill in the comparison decision

Use this check with the quotation worksheet. Identify the evidence behind each decision and the next action for any open difference. Reviewer: ______. Review date: ______.

Fill in the comparison decision
Comparison checkProposal A: reference / statusProposal B: reference / statusBuyer decision / evidence / next action
Common requirement and quantity basisSpecification / option: ______; status: ______Specification / option: ______; status: ______Decision: ______; evidence: ______; next action: ______
Development, inclusions and evidenceScope / quotation: ______; status: ______Scope / quotation: ______; status: ______Decision: ______; evidence: ______; next action: ______
Currency and delivery responsibilitiesCommercial reference: ______; status: ______Commercial reference: ______; status: ______Decision: ______; evidence: ______; next action: ______
Date, event and start conditionsSchedule / milestone: ______; status: ______Schedule / milestone: ______; status: ______Decision: ______; evidence: ______; next action: ______

Record “same basis identified” or name the difference that needs clarification. Add the responsible contact and review date to the open-decisions entry. Link the selected quotation or option ID to the sample approval record. If the product or quantity changes, obtain the matching revised quotation and reconfirm materials, approvals and schedule.

To discuss a proposal, share the specification or option reference, quantity split, desired scope and open questions. Choose OEM, ODM or advice according to your brief.

CSV · Blank template

Sample review & approval record

Keep measurements, appearance and decisions in one record before discussing production.

Download English worksheet ↓
  • Style / sample ID / size / colour / specification version
  • Sample stage & date
  • Measurement points / agreed tolerances
  • Finished swatch / yarn reference

CSV · Blank template

Sourcing document review log

Use one row for each document your buying team wants to review. Link the record to the relevant site, yarn, sample or order and record the review decision and open actions. This is a blank buyer log, not an issued certificate or quality report.

Download English worksheet ↓
  • Review purpose / buyer requirement
  • Document type / scheme / edition
  • Document reference / issuer
  • Legal holder / manufacturing site

These are blank planning templates, not a Huayang quotation, approved specification or quality report. CSV files open in common spreadsheet applications. Keep confidential buying information in your own files; downloads do not submit it to this website.

Compare prices against the same delivery scope

Keep each proposal's product inclusions, delivery reference and responsible parties together. A quoted garment price, a transport estimate and a destination charge cover different parts of your purchasing budget. Record which costs are included, excluded or awaiting confirmation.

Compare prices against the same delivery scope
Review pointRecord for each proposalConfirm before comparing
Quotation and delivery referenceUnit-price currency, product inclusions and named handover or destination point. When using Incoterms® rules, record the rule, edition and precise named place or port.Use an agreed delivery reference and transport mode. Identify which quoted costs and responsibilities apply up to which location.
Transport and insuranceWho arranges transport and any agreed insurance; quotation reference and included, excluded or pending charges.Compare the same transport and insurance scope. Keep separate charges visible and resolve arrangements that remain open.
Clearance and destination chargesResponsible parties for export/import formalities and applicable destination charges, including duty, tax and brokerage items to confirm.Record inclusions, exclusions and estimates separately for the proposed order and destination. Confirm responsible parties and unresolved conditions.
Schedule and handover targetThe requested date, place and event, with the stated start conditions, material readiness and approval milestones.Compare the same milestone. Factory dispatch, carrier handover and destination arrival can be different events; confirm how open materials or approvals affect the proposed date.

Connect the sourcing requirement to the right evidence

Name the question your team needs answered before collecting documents. Record the document reference, its relevant scope and any open review decision, rather than treating a programme of interest as an approved material claim for the order.

Connect the sourcing requirement to the right evidence
Buying questionDocument to reviewLink to the proposed project
Factory and management reviewQuality-management certificate and/or factory audit records appropriate to your sourcing programme.Match the legal holder, manufacturing site, edition and dates. Record relevant findings, follow-up information and your buying team’s review decision.
A claim about a selected materialMaterial or product certification and scope documentation relevant to the selected claim; order, transaction or shipment documents only where required by the applicable scheme and order.Match the holder, selected yarn, covered products and processes to the proposed order. A product or scope document does not by itself establish an order or shipment claim; record any supporting evidence required by the applicable scheme.
Product performance or garment inspectionThe agreed product test report and/or garment-inspection record.Match the sample and specification version, check conditions, method and result. Record findings, follow-up review and the agreed disposition; do not assign a certificate expiry date to every test report.

Turn your worksheet into a clear first enquiry

Keep the filled worksheet with your buying team. Identify the known requirements, alternatives and questions still open, then choose the OEM, ODM or advice starting point in the first-enquiry guide.

Choose your enquiry starting point →

A clear record from enquiry to approval

  1. Start with one style ID and specification version.
  2. Separate confirmed requirements from alternatives you can consider.
  3. Compare quotations on the same quantity split, currency and delivery basis.
  4. Record sample comments against the specification and keep the approved reference.

Plan your OEM or ODM knitwear project

For OEM, send your design or specifications. For ODM, share the collection you have in mind. Include quantities by colour, target purchase price, sales market and the required dispatch or arrival date. We coordinate materials, development and production; every order receives 100% garment inspection by our independent department using Japanese standards.

Discuss your project

Technical decisions and order changes

Detailed English guides with practical records for technical review, order control and quotation comparison.